BORA BETTER, MUCH BETTER

Residential

Aaron Circuit

Suburb
Browns Plains
Year
2025
Design
Builder
Bora Landscape Build
Lighting
Size

Project Overview

This Browns Plains project addressed persistent water inundation by reshaping the site and establishing a clear, reliable drainage path through the property.

The ground was regraded and levels carefully adjusted before an underground drainage system was installed to direct stormwater towards the street kerb outlet. An exposed aggregate pathway completed the works, providing a durable and visually consistent surface through the side access area.

The upgrade transformed a water-prone section of the property into a cleaner, more functional and better-drained outdoor space.

Project Highlights
• Site regrading and level correction
• Underground stormwater drainage
• Drainage connection towards the street kerb
• Exposed aggregate side pathway
• Practical resolution of recurring surface water issues