Installation
How to install your new lawn
- Remove all building waste and weeds.
- Spread a free draining soil to a depth of 7-15cm or loosen ground and mix in appropriate soil conditioners. For sandy soils, simply mix in organic material and rotary hoe.
- Level the surface using a screeding board, lawn leveller or similar device.
- Apply a low analysis fertiliser with an N:P:K of approximately 5:6:5 or lawn starter fertiliser to the surface and incorporate with a rake.
- In hot months, moisten the soil but do not make the soil too wet. Do not lay turf on hot, dry soil.
- Lay the turf as soon as possible after delivery using a brickwork pattern.
- On hot days, lay a section of turf and lightly water. Repeat this until all turf is laid. On cool days, turf can be laid all at once. Roll and immediately water thoroughly.
- Water thoroughly for 7-10 days or until turf is established. Take care that the water is saturating the soil beneath the turf. In colder months, the turf will take longer to establish. The turf should not dry out until the roots are established.
- When the soil has firmed and the turf has rooted down, usually 2-3 weeks after laying, or longer in winter, mow lightly to tidy up the lawn.
- Avoid walking on your new turf as much as possible during the establishment period to prevent the soil compacting and becoming uneven due to footprints.